Hello!



Click here to register
for FREE copies
[confidentiality
guaranteed]
Contractors World


The UK and Ireland's only FREE to READ publication for construction, demolition, mining and quarrying industries
in a convenient digital format

Contractors World  - UK & Ireland
2013 Vol 3 No 6
Tell a friend:
Print Page Register (free) Bookmark Page

Contractors World UK
More news in the
Contractors World - International issue


BREAKING NEWS


LIBRARIES

• back issues
•  brochures
• 
videos


recent issues

CW UK & Ireland
No: 1 No: 2

CW UK & Ireland
No: 2 No: 1 No: 2

CW UK & Ireland
No: 1 No: 2 No: 1 No: 2

 



previous page   PAGE 19 of 52    next page

Tweet this page


This page could be your company.

Reach 40,000 decision makers in the construction industry throughout the UK & Ireland.

Advertise in Contractors World





«  Previous

 

Next  »  

 

 

New heights for Alimak Hek on The Tower residential building - continued

 

Two Alimak Scando 650 FC-S high speed construction hoists (100 m/min )High speed construction hoists

Two Alimak Scando 650 FC-S high speed construction hoists (100 m/min ) have been installed because this model has been specifically designed to speed up construction time and save costs.

On The Tower, full height transit time has been reduced to just 90 seconds, compared to over 4 minutes using standard hoists. The hoists also incorporate VFC drives which have improved levelling accuracy. Another benefit of VFC drives is their energy efficiency. Power savings of around 30% have also been achieved, which makes it great value for money.

Mammoth hoist

Hoists are installed in conjunction with the common tower system which is manufactured from aluminium alloy to minimise weight and has a small 5 m x 5 m footprint yet is capable of running multiple hoists simultaneously.

This access system allows all material and personnel transportations to be concentrated in one area, which streamlines loading efficiency at ground level.

The hoist system installed at The Tower also incorporates a 3 m x 4.6 m ‘Mammoth’ hoist from Alimak Hek with a safe working payload of 5,500 kg which is crucial for the fast movement of large materials required for modern buildings.

With all hoists operating simultaneously, it minimises waiting times for men and materials, especially at peak times. Unlike other vertical access systems the Alimak Hek and common tower solution provides an open clear (5 m x 5 m) landing space at each floor to allow an enhanced and safe flow of materials in and out of the hoists.

alimak hoist specifications      As only the common tower, and not the hoists, are tied directly into the building, it means external cladding can be applied to the whole building during construction with the exception of the 4.5 metre access openings at each level.

As a result there are far fewer panels to replace at the end of the project, which dramatically speeds up de-rigging.

The combination of the Alimak hoists and common tower not only saves time and boosts efficiency during construction but is also far quicker to install and remove than conventional stand-alone hoist systems, so there are major savings at the start and end of the project as well.

Click here for more information
>>> Alimak Hek

 

previous page   PAGE 19 of 52   next page

 
red divide
CW Contractors World - the digital publication for construction industry

Contractors World Magazines are published by VVV Limited
©VVV Ltd 2013 All Rights Reserved

Publisher: Roger Lindley
Content compiled and edited by:
Roger Lindley MCIM

Page updated: November/December 2013

 

READ OUR OTHER MAGAZINES

Contractors World -UK & Ireland
Contractors World - International up-to-date information on news, plant and equipment from around the world.

CLICK HERE


Contractros World - Australia
Australia News


cmldir.com
Online Buyers Guide of Construction, Quarrying

Contractors World - Eco Friendly publishingBy reading this page on line you are helping to save trees.
Trees saved up to November/December 2012 > 1600


The monthly magazine Contractors World - UK & Ireland is proud to promote and support the Lighthouse Club Please give generously. Contractors World Support the Lighthouse Club


CONTRACTORS WORLD MAGAZINES
CML House
7 Bell Mead
Sawbridgeworth
Herts CM21 9ES
UK
Tel: +44 1279 600598
Email: infodesk@cwmags.com
URL: http://www.cwmags.com

Contractors World is many magazines in one - construction news for latest information (read our daily news pages) and a site equipment magazine featuring site reports from around the world and reviews of construction plant and equipment as it is introduced.

Written specifically for earthmovers, quarry management, plant hire executives, and others with an interest in the construction and related industries. Configured for all Internet devices, iPads, tablets and PDF readers.

Registered Office: 54 Sun Street, Waltham Abbey, Essex EN9 1EJ, UK
Registered as a company in England and Wales, number 3892263

Contractors World and the Contractors World - UK & Ireland Edition are independent publications published for CWMAGS Ltd by VVV Ltd.

The mention of companies and/or products within the editorial pages or in advertisements does not infer any endorsement by the publisher or editors. All editorial is freely given, without conditions and at the sole discretion of the editor. Opinions expressed by contributors are not necessarily those of the publishers. Other than saving and distributing in complete page formats, copying, reproduction, decoding or disassembly of content or computer code by any means of any part of the publication is prohibited unless prior approval is provided by VVV Ltd in writing and confirmation received of agreement with any terms and conditions applicable. PDF version may be downloaded for personal use but no content may be used for promotional purposes or copied to web sites. All images and video content are subject to copyrights.