Contractors World


The UK and Ireland's only FREE to READ publication for construction, demolition, mining and quarrying industries
in a convenient digital format

Contractors World  - UK & Ireland
2012 Vol 2 No 9
Forward: Print Page Register (free) Bookmark Page

Contractors World UK
More news in the
Contractors World - International issue


BREAKING NEWS


LIBRARIES

• back issues
•  brochures
• 
videos



previous page   PAGE 22 of 40    next page

Construction News - Economics - Business - Regulations

Engineers:
Long Term Energy Goals Require Long Term Thinking

As Government prepares to publish its Energy Bill, paving the way to 2020, leading engineers have urged policy makers to also start planning for the longer term – considering how the UK’s energy system could look in 2030 and what action will be required now in order to deliver it.

In a new paper published, "Post 2020 energy scenarios and pathways to 2030", the Institution of Civil Engineers (ICE) says the policy framework to drive action up to 2020 is well advanced – most notably through the Electricity Market Reform. But it warns that even more ambitious action will also be required during the 2020s if we are to secure a decarbonised 2030 – and this action must be planned for soon.

Past ICE President, Richard CoackleyPast ICE President, Richard Coackley, said: "We know the UK’s energy system in 2030 needs to look very different to today’s and there are already a number of scenarios which sketch out how a successfully decarbonised energy system could look in 2030. But none of these visions can become reality without a policy framework that enables action not only in the 2010s but in the 2020s. The Climate Change Committee itself highlights the need for a "significantly faster pace of progress" through the 2020s but this cannot happen unaided.

"To maximise the chances of a decarbonised 2030, the existing scenarios must be explored in more detail taking into consideration political, economic, environmental, social, legal and technological factors. This will allow major challenges to be identified followed by the formation of the next wave of policy that will facilitate the accelerated progress required."

ICE says policymakers will face a number of challenges when plotting a "policy pathway" to 2030 - many of these relating to political will, policy certainty and public attitudes, wich are critical factors in the transition to a low carbon society.
Time of policymaker to make decisions

It urges policymakers to ensure future energy policy:

For electricity:

  • Commits to a target to almost completely decarbonise electricity by 2030 – a binding target will help provide certainty and confidence for investors and industry
  • Dispels the notion that the answer is gas, or nuclear, or renewables – all are required in large measures
  • Provides more clarity on how investors can be protected from future political and policy risk
  • Redoubles efforts to demonstrate and deploy carbon, capture and storage (CCS) and develops energy storage technologies – both of which could prove to be global game changers
  • Acknowledges the implications of the additional significant heat and vehicle demands on the electricity system and develops a clear strategy to manage it

For heat

  • Accelerates demand reduction through better insulation and controls
  • Ensures uptake of renewable heat continues to be pursued through regulation, cost reduction and better installation standards

For transport

  • Ensures energy is a priority for any transport strategy. In transport – unlike in electricity and heat – emissions have not been reduced and there are difficult questions about demand reduction and management, modal shift and public attitudes. The UK transport strategy must be integrated with energy a top priority.

Coackley concluded: "In the next 12 months, political thought will increasingly turn towards party manifestos. As emission reduction targets demand changes in heat and transport, they will also demand changes in the habits and behaviour of consumers. This presents an opportunity for considered, practical policy solutions that will help the UK reach its long term energy goals."

[cwmags]

 

Tweet this page


 

 

 

previous page   PAGE 22 of 40   next page

 
red divide
CW Contractors World - the digital publication for construction industry

Contractors World Magazines are published by VVV Limited
©VVV Ltd 2012 All Rights Reserved

Publisher: Roger Lindley
Content compiled and edited by:
Roger Lindley MCIM

Page updated: December 2012

 

READ OUR OTHER MAGAZINES

Contractors World -UK & Ireland
Contractors World - International up-to-date information on news, plant and equipment from around the world.

CLICK HERE


Contractros World - Australia
Australia News


cmldir.com
Online Buyers Guide of Construction, Quarrying

Contractors World - Eco Friendly publishingBy reading this page on line you are helping to save trees.
Trees saved up to December 2012 > 1001


The monthly magazine Contractors World - UK & Ireland is proud to promote and support the Lighthouse Club Please give generously. Contractors World Support the Lighthouse Club


CONTRACTORS WORLD MAGAZINES
CML House
7 Bell Mead
Sawbridgeworth
Herts CM21 9ES
UK
Tel: +44 1279 600598
Email: infodesk@cwmags.com
URL: http://www.cwmags.com

Contractors World is many magazines in one - construction news for latest information (read our daily news pages) and a site equipment magazine featuring site reports from around the world and reviews of construction plant and equipment as it is introduced.

Written specifically for earthmovers, quarry management, plant hire executives, and others with an interest in the construction and related industries. Configured for all Internet devices, iPads, tablets and PDF readers.

Registered Office: 54 Sun Street, Waltham Abbey, Essex EN9 1EJ, UK
Registered as a company in England and Wales, number 3892263

Contractors World and the Contractors World - UK & Ireland Edition are independent publications published through CWMAGS by VVV Ltd.

The mention of companies and/or products within the editorial pages or in advertisements does not infer any endorsement by the publisher or editors. All editorial is freely given, without conditions and at the sole discretion of the editor. Opinions expressed by contributors are not necessarily those of the publishers. Other than saving and distributing in complete page formats, copying, reproduction, decoding or disassembly of content or computer code by any means of any part of the publication is prohibited unless prior approval is provided by VVV Ltd in writing and confirmation received of agreement with any terms and conditions applicable. PDF version may be downloaded for personal use but no content may be used for promotional purposes or copied to web sites. All images and video content are subject to copyrights.