Contractors World


The UK and Ireland's only FREE to READ digital publication for construction, demolition, mining and quarrying industries

Contractors World UK & Ireland
2012 Vol 2 No 4   
Forward: Print Page Register (free) Bookmark Page

cw cw cw cw cw Buyers Guide cw cw cw

contractors world magazines on facebookContractors World magazines onTwitter
Facebook Twitter

Contractors World UK
Read more news in the
Contractors World
International


BREAKING NEWS

 

SEE MORE


LIBRARIES

• back issues
•  brochures
• 
videos


Contractors World - Eco Friendly publishing
Sponsor a tree
by planting
your logo
in our
virtual forest
to aid the

Lighthouse Club
Benevolent Fund

previous page   PAGE 12 of 43    next page

Crossrail First spray concrete lined tunnels completedCrossrail

Crossrail First spray concrete lined tunnels complete-2

Tweet this page


 

 

First spray concrete lined tunnels completed

The project’s first two sprayed concrete tunnels have been constructed under Finsbury Circus in the City of London. The works are part of construction for Crossrail Liverpool Street station. The 4.5 metre diameter tunnels have been built from the main access shaft within the Finsbury Circus worksite.

The two tunnels are temporary structures and will be used for compensation grouting, one of the ways that Crossrail will control any ground movements that could result from tunnelling activity.

Small diameter tubes (Tubes a’ Manchette) will be drilled and installed from the temporary tunnels allowing the contractor to inject grout into the ground. This will stabilise the ground and limit surface settlement.

A Sprayed Concrete Lining (SCL) technique has been used to build these tunnels. This technique involves rapidly spraying the excavated ground with concrete to stabilise it and form the permanent tunnel lining. The first SCL tunnel measures 80 m in length and the second (running east from the worksite) is 100 m long.

The Spray Concrete Lining technique will be used to build 12 km of station platform tunnels, passages, access and grout tunnels along the Crossrail route where smaller, relatively short tunnels are needed.

Unlike bored tunnels, SCL allows variation in the tunnel shape and diameter and 7.5 km of SCL tunnels will become permanent features of the project.

The 4.5 metre diameter tunnels have been built from the main access shaft within the Finsbury Circus worksite.    Colin Niccolls, Crossrail’s Whitechapel & Liverpool Street Platform Tunnels Project Manager said, “Crossrail will primarily use two different types of tunnelling technique to build the new rail tunnels and stations.

The 4.5 metre diameter tunnels have been built from the main access shaft within the Finsbury Circus worksite.

While tunnel boring machines will create the new rail tunnels, work has commenced on creating the station tunnels using mining techniques to excavate the ground which is then sprayed with shotcrete to form the tunnel linings.”

The works are being undertaken by BBMV JV (Balfour Beatty Civil Engineering, Alpine BeMo Tunnelling, Morgan Sindall and VINCI Construction) as part of the C510 contract – Early Access Shafts and Spray Concrete Lining works for Whitechapel and Liverpool Street station tunnels.

Works at Connaught Tunnel pick up pace

Crossrail has begun drilling wells at Connaught Tunnel to draw down the water table ahead of works to deepen and widen the 130 year old tunnel in east London.

Once the wells are completed, drawing down of the water table will begin next month which is required ahead of works to widen and deepen the central section of the Connaught Tunnel so it can accommodate Crossrail’s larger trains.

page 2 of 2 >>>

 

previous page   PAGE 12 of 43   next page

 
red divide
CW Contractors World - the digital publication for construction industry

Contractors World Magazines are published by VVV Limited
©VVV Ltd 2012 All Rights Reserved

Publisher: Roger Lindley
Content compiled and edited by:
Roger Lindley MCIM

Page updated: May 2012

 

READ OUR OTHER MAGAZINES

Contractors World -International
Contractors World International up-to-date information on news, plant and equipment from around the world.

CLICK HERE


Contractros World - Australia
Australia News


cmldir.com
Online Buyers Guide of Construction, Quarrying

Contractors World - Eco Friendly publishingBy reading this page on line you are helping to save trees.
Trees saved up to May 2012 > 678
See our virtual forest


The monthly magazine Contractors World - UK & Ireland is proud to promote and support the Lighthouse Club Please give generously. Contractors World Support the Lighthouse Club


CONTRACTORS WORLD MAGAZINES
CML House
7 Bell Mead
Sawbridgeworth
Herts CM21 9ES
UK
Tel: +44 1279 600598
Email: infodesk@cwmags.com
URL: http://www.cwmags.com

Contractors World is many publications in one - construction news for latest information (read our daily news pages) and a site equipment magazine featuring site reports from around the world and reviews of construction plant and equipment as it is introduced.

Written specifically for earthmovers, quarry managers, plant hire executives, and others with an interest in the construction and related industries. Contractors World are today, the world leading e-magazines for the construction industry - redefiining publishing for the digital age

Registered Office: 54 Sun Street, Waltham Abbey, Essex EN9 1EJ, UK
Registered as a company in England and Wales, number 3892263

Contractors World and Contractors World - UK & Ireland Edition are independent publications published through CWMAGS by VVV Ltd.

The mention of companies and/or products within the editorial pages or in advertisements does not infer any endorsement by the publisher or editors. All editorial is freely given, without conditions and at the sole discretion of the editor. Opinions expressed by contributors are not necessarily those of the publishers. Other than saving and distributing in complete page formats, copying, reproduction, decoding or disassembly of content or computer code by any means of any part of the publication is prohibited unless prior approval is provided by VVV Ltd in writing and confirmation received of agreement with any terms and conditions applicable. PDF version may be downloaded for personal use but no content may be used for promotional purposes or copied to web sites. All images and video content are subject to copyrights.