Contractors World


The UK and Ireland's only FREE to READ digital publication for
construction, demolition, mining and quarrying industries

Contractors World UK & Ireland
2011 Volume 1 Issue 8
Forward: Print Page Register (free) Bookmark Page

cw cw cw cw cw Buyers Guide cw cw cw

BREAKING NEWS

 • Seddon and Viaduct Housing Partnership building for the future.


 • GT Access Takes UKs First 15 m Hinowa Booms
 • Snorkel UK Appoints PLP Lift Trucks As Regional Dealer
 • A-Plant to Merge Lion Trackhire and Eve under New Name
 • Lendlease have renewed their framework agreement with Human Recognition Systems.
 • RPS Appointed for GWR Exeter Depot Expansion

 

SEE MORE


LIBRARIES

• back issues
•  brochures
• 
videos


Contractors World - Eco Friendly publishing
Sponsor a tree
by planting
your logo
in our
virtual forest
to aid the

Lighthouse Club
Benevolent Fund

previous page   PAGE 17    next page

JCB ensures rapid river crossing for pipeline firm - Page 2 of 2

Speed of operation, controllability and responsiveness are also crucial as we are generally paid per metre of pipeline laid.   Waitings Director, Adrian Ash said: “We have used JCB kit since our formation in 1970 and have always been impressed with the performance and reliability – both of which are crucial in our specialist business.

Speed of operation, controllability and responsiveness are also crucial as we are generally paid per metre of pipeline laid. Jobs are always time sensitive – just like this current project - and JCB excavators always deliver. The service and support from our dealer, Scot JCB, is also first class.”

Stuart Newby, contracts manager at Volker Stevin, said: “This was a technically challenging piece of civil engineering,

On going project

    Such was the deadline that work continued around the clock.The scheme will reduce the amount of storm water discharged through these pipes into the River Lune during storms, as the sewer network in North Shore of the city struggles to cope during heavy downpours.

Such was the deadline that work continued around the clock.

The first phase of work saw the construction of the new crossing pipe 2 metres beneath the river near Kingsway, GHA Livigunn were appointed by Volker Stevin to undertake the detailed design. The project involved the transfer of continuation flows via a new rising main crossing the River Lune.

    The project required meticulous planning due to environmental considerations and the migration of salmon and trout. There was a limited period between June and the end of September in which the works had to be undertaken to comply with regulations from the Marine Management Organisation.

GHA Livigunn design services included;

  • Detailed design of approximately 161 m of rising main within the channel of the River Lune
  • Detailed design of approximately 42 m of rising main along the banks of the River Lune
  • Specification of primary and secondary pipeline
  • Design of anti-flotation measures
  • Civils 3D modelling to optimise the pipework alignment

For more information >>> JCB Excavators
Waitings
Volker Stevin
GHA Livigunn

 

 

 

previous page   PAGE 17   next page

 
red divide
CW Contractors World - the digital publication for construction industry

Contractors World Magazines are published by VVV Limited
©VVV Ltd 2011 All Rights Reserved

Publisher: Roger Lindley
Content compiled and edited by:
Roger Lindley MCIM

Page updated: December 2011

 

READ OUR OTHER MAGAZINES

CP&E Contractors Plant & Equipment
CP&E Contractors Plant & Equipment up-to-date information on plant and equipment.

CLICK HERE


Contractors World -International
Contractors World International up-to-date information on news, plant and equipment from around the world.

CLICK HERE


Contractros World - Australia
Australia News


cmldir.com
Online Buyers Guide of Construction, Quarrying

Contractors World - Eco Friendly publishingBy reading this page on line you are helping to save trees.
Trees saved up to October 2011: >450
See our
virtual forest


Support the Lighthoue Club Benevolent Fund by sponsoring virtual trees Support the Lighthouse Club Benevolent Fund by sponsoring virtual trees


CONTRACTORS WORLD MAGAZINES
CML House
7 Bell Mead
Sawbridgeworth
Herts CM21 9ES
UK
Tel: +44 1279 600598
Email: infodesk@cwmags.com
URL: http://www.cwmags.com

Contractors World is many magazines in one - construction news for latest information (read our daily news pages) and a site equipment magazine featuring site reports from around the world and reviews of construction plant and equipment as it is introduced.

Written specifically for earthmovers, quarry management, plant hire executives, and others with an interest in the construction and related industries.

Registered Office: 54 Sun Street, Waltham Abbey, Essex EN9 1EJ, UK
Registered as a company in England and Wales, number 3892263

Contractors World, CP&E - Contractors Plant & Equipment and the Contractors World - UK & Ireland Edition are independent publications published through CWMag by VVV Ltd.

The mention of companies and/or products within the editorial pages or in advertisements does not infer any endorsement by the publisher or editors. All editorial is freely given, without conditions and at the sole discretion of the editor. Opinions expressed by contributors are not necessarily those of the publishers. Other than saving and distributing in complete page formats, copying, reproduction, decoding or disassembly of content or computer code by any means of any part of the publication is prohibited unless prior approval is provided by VVV Ltd in writing and confirmation received of agreement with any terms and conditions applicable. PDF version may be downloaded for personal use but no content may be used for promotional purposes or copied to web sites. All images and video content are subject to copyrights.